Thursday, May 21, 2009

Wednesday, May 20, 2009

Progress on the Boardwalks

creating the frame for the second boardwalk, under the upper deck



Cutting decking (composite material)

Installing decking. Using the drywall T-square as a spacer.

Boardwalk to the shed (almost) completed!

Monday, May 4, 2009

Terrace Frames

Posts set in concrete, support beams attached


Outer frames constructed

Landscape fabric and cardboard laid down,
some of the lava rock spread out. Joists added.

Removing previous step surface from shed
(to be replaced with decking to match everything else)


Boardwalk to shed built

View from the shed