Posts set in concrete, support beams attached
Outer frames constructed
Landscape fabric and cardboard laid down,
some of the lava rock spread out. Joists added.
Removing previous step surface from shed
(to be replaced with decking to match everything else)
Boardwalk to shed built
View from the shed
0 comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
▼
2009
(23)
►
December
(3)
Our first game at Lambeau
New Artificial Tree
Christmas is almost here!
►
September
(5)
Paint is (almost) done!
Red House, Wrong Trim
Primed!
BEFORE New Paint
142 Miles
►
August
(1)
Update-8/17
►
July
(4)
Garden-7/13
Garden-7/6
Garden-6/21
Sunscreen for the Upper Deck
►
June
(2)
Terrace Almost Complete
The garden
▼
May
(3)
Installing the decking
Progress on the Boardwalks
Terrace Frames
►
April
(4)
30 cubic yards of gravel
Terrace Site Preparation
The Terrace - BEFORE
Finally! Flowers blooming
►
January
(1)
Happy New Year from the Polar Bears!
►
2008
(9)
►
December
(1)
It's Beginning to Look a Lot Like Christmas
►
November
(2)
Wrought Iron Fence
New Shed and Lawn
►
October
(3)
One tree out, Three trees in
Nearing Completion of deck
Deck continues.
►
September
(3)
Upper Deck - Reconstruction
Upper Deck - DEMOLITION
The Upper Deck - BEFORE
About Me
fjwu&hdwu
View my complete profile
0 comments:
Post a Comment